Brabender Technologie GmbH & Co. KG develops and builds equipment and systems for dosing, weighing and discharging as well as flow measurement of bulk materials at its headquarters in Duisburg. Grown building structures and complex logistic structures led to the fact that an efficient work was only possible to a limited extent. MALORG Consulting conducted a potential analysis for the family-owned company and prepared the concept planning for a new logistics building.
Success stories
Potential analysis with action plan for the implementation of a logistics restructuring for Brabender
31. May 2022, Reading time: 1 min 51 second
Initial situation
- Breaks in the material flow, time-consuming multiple handling, goods bottlenecks and unnecessary idle times of the articles
- Incoming goods, outgoing goods, warehouse and assembly in different buildings
Potential analysis
- Analysis to identify unnecessary work steps, distances & processes
- entire logistic process in connection with work preparation, production planning and purchasing
- Focus: Improvement of ergonomics for assembly workplaces
Concept planning for the new building
- Efficient material flows and waste-free processes
- Support in the arrangement of the functional areas goods receipt, warehouse, repair, mechanical and mechatronic production, switchgear construction, test field and dispatch
- dynamic staging concept
Results
- Streamlining of processes
- Saving of the used area
- Reduction of material throughput times