The additional establishment of a workshop ensures the time-optimized handling of repairs, allowing a maximum repair time of five days within Western Europe. MALORG Consulting was commissioned to identify restructuring measures for the warehouse.
Success stories
Determination of potential for bearing compression and efficiency increase for Bosch
31. May 2022, Reading time: 1 min 32 second
Sustainable improvement
- Examination of existing organizational and physical warehouse structures in order to steer restructuring measures in the best possible direction.
- Goal: Sustainable improvement of inventory and process structure
- Analysis of item master, inventory and movement data for statements on item classification and trends, inventory range and availability & warehouse utilization
The result
1. storage space compression by merging start-ups.
2. range optimization by discarding excess stock
3. multiple bin storage of non-moving or low-moving items
4. optimization through strategic measures